Skip to main content
Free Download

BC Renovation Hearing Evidence Checklist

A landlord checklist for an RTB renovation hearing: evidence for each part of the s.49.2 test, the filing steps, the 14-day evidence deadline and file rules.

PDF17 itemsFor landlords

What's Inside

The first 5 of 17 steps

  1. Good faith and permits: issued permits covering the work that needs vacancy, strata approval if a bylaw requires it, and contracts, quotes or a construction schedule.
  2. Requires vacancy: a contractor's or engineer's written scope naming the tasks that need the unit empty and for how long; hazard reports such as an asbestos survey.
  3. Prolong or sustain: inspection or condition reports, engineering assessments, code deficiencies, photos of current conditions.
  4. Only reasonable way: the vacancy period in days, why staging unit by unit will not work, and any discussion with the tenant about a temporary move.
  5. If your job is in Guideline 2B's "Unlikely" column, such as a re-pipe or roof replacement, explain what makes your building different.

+12 more items in the full checklist

Get Your Free Copy

Enter your email to download instantly

No credit cardUnsubscribe anytime